• Swimming Pool of Storage

 

 


 

 

 

 

 

 

 

 



CONSTRUCTION OF A SWIMMING POOL OF
PHOSPHORIC STORAGE OF ACID
Project Manager : The
ICS (Chemical Industries of Senegal)





Stage 1 : General Earthworks


Stage 2 : Installation of the merlon






Stage 3 : Hydraulic compacte


Stage 4 : Adjustement of the merlon






Stage 5 : Adjustment of the merlon and installation of the interior pavement

Stage 6 : Idem, with a different angle
of sight





Stage 7 : Idem


Stage 8 : Idem






Stage 9 : Installation of the external
pavement

Stage 10 : Installation of the sealing
and sea water filling for test






Stage 11 : Idem, with a different
angle of sight


Stage 12 : Swimming Pool full of sea water
Successful test
GE
Km 11, Route de Rufisque  -  BP: 8782 Dakar-Yoff
(221) 8398383    -     (221) 8341604    -   gesenegal@sentoo.sn